Electrical was much more time consuming than I would have imagined. I had a lot more fishing through masonry than I initially imagined. It worked out pretty well though, most voids in the CMU were possible to maneuver through.
The data cables for the house were also a larger burden than anticipated because of the 4 coax lines I ran to each location and also all the cat 5, cat 6, speaker, control wiring, and security wiring.
Here a picture of the wires for my media cabinet in the living room.
The Junction Box to handle all the wiring in the CMU.
The outdoor outlets covers I chose. Also seen is the PVC pipe that contains the sprinkler wire, I changed the location so the controller could be inside in a storage closet
Here's the switches and controller box for the kitchen and back patio.
Added switches and outlets to the hallway bath where there had been none.
No comments: